I-65 NB over WET WEATHER CREEK

1.3 MI N JCT SR 21 · County 053, Alabama · Built 1960 · 2 Lanes · 12,286 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
006821
Year Built
1960
Length
72.5 m (237.9 ft)
Max Span
10.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
12,286
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,874,000
Total Project Cost
$2,061,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.