I59 over BRANCH

0.2 MI S JCT I59 * CO 140 · County 049, Alabama · Built 1960 · 6 Lanes · 14,262 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
006773
Year Built
1960
Length
9.4 m (30.8 ft)
Max Span
3 m
Lanes
6
Daily Traffic
14,262
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,673,000
Total Project Cost
$5,140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.