COUNTY RT 75 over MAGBY CREEK

3.5 MI NORTH OF US HWY 82 · County 107, Alabama · Built 1959 · 2 Lanes · 350 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
006669
Year Built
1959
Length
19.2 m (63 ft)
Max Span
3.7 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
350
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$414,000
Total Project Cost
$455,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.