CO RD 61 over ROBINSON CREEK

0.2 MI S CO 61 CO 36 JCT · County 059, Alabama · Built 1959 · 2 Lanes · 115 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
006641
Year Built
1959
Length
40.5 m (132.9 ft)
Max Span
5.8 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
115
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$824,000
Total Project Cost
$906,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.