CR-45 over Unnamed Branch

1.89 MI. NE CR-31 · County 037, Alabama · Built 1959 · 2 Lanes · 193 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
006621
Year Built
1959
Reconstructed
1993
Length
10.4 m (34.1 ft)
Max Span
5.2 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
193
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$293,000
Total Project Cost
$322,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.