CR. 42 over STALLINGS CREEK

1 MI.W.JCT. I-65 * FAS 15 · County 013, Alabama · Built 1959 · 2 Lanes · 1,635 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 5 Fair

Location

31.846103, -86.665792

This bridge is in worse condition than 76.2% of bridges in County 013. The average bridge in Alabama is 0 years old; this one is 67 years old.

Nearby Bridges

Bridge Details

Structure #
006619
Year Built
1959
Length
17.4 m (57.1 ft)
Max Span
5.8 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
1,635
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$385,000
Total Project Cost
$424,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.