SR15/US29 over I-85

JCT I-85 / US 29(EXIT 79) · County 017, Alabama · Built 1959 · 4 Lanes · 24,968 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
006574
Year Built
1959
Length
80.8 m (265.1 ft)
Max Span
22.3 m
Width
25.4 m (83.3 ft)
Lanes
4
Daily Traffic
24,968
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,170,000
Total Project Cost
$5,687,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.