CO RD 23 over I-65

5.9 MI S US 84 · County 035, Alabama · Built 1959 · 2 Lanes · 495 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
006464
Year Built
1959
Length
80.5 m (264.1 ft)
Max Span
24.1 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
495
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,800,000
Total Project Cost
$1,980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.