CO RD 6 over I-65

EXIT 83 · County 035, Alabama · Built 1959 · 2 Lanes · 1,523 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
006461
Year Built
1959
Length
75.3 m (247 ft)
Max Span
20.7 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
1,523
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,700,000
Total Project Cost
$1,870,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.