SR 210 MP 9.990 over SR 52 C. OF GA. R.R.

JCT. OF ALA.52 E · County 069, Alabama · Built 1958 · 3 Lanes · 14,085 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
006411
Year Built
1958
Reconstructed
1981
Length
69.2 m (227 ft)
Max Span
18.9 m
Width
13.7 m (44.9 ft)
Lanes
3
Daily Traffic
14,085
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,454,000
Total Project Cost
$2,699,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.