SR 117 over TENNESSEE RIVER

3 MI S OF STEVENSON · County 071, Alabama · Built 1958 · 2 Lanes · 3,353 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

34.832597, -85.800239

This bridge is in worse condition than 62.9% of bridges in County 071. The average bridge in Alabama is 0 years old; this one is 68 years old.

Nearby Bridges

Bridge Details

Structure #
006378
Year Built
1958
Length
427 m (1400.9 ft)
Max Span
152.4 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
3,353
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,076,000
Total Project Cost
$9,984,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.