CO.RD.95 MP 14.723 over CEDAR CREEK

3 MI.N. OF GORDON · County 069, Alabama · Built 1958 · 2 Lanes · 420 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
006369
Year Built
1958
Length
121.6 m (399 ft)
Max Span
18.3 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
420
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,409,000
Total Project Cost
$2,650,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.