CO. HWY. 61 over FOURMILE CREEK

1.5MI N JCT ST 25 · County 117, Alabama · Built 1958 · 2 Lanes · 1,031 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
006332
Year Built
1958
Length
62.1 m (203.7 ft)
Max Span
10 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
1,031
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,144,000
Total Project Cost
$1,258,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.