CHEROKEE #12 over BRANCH

0.2 MI N INT CHERO #29 · County 019, Alabama · Built 1958 · 2 Lanes · 330 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
006197
Year Built
1958
Length
9.4 m (30.8 ft)
Max Span
4.7 m
Width
5.8 m (19 ft)
Lanes
2
Daily Traffic
330
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$211,000
Total Project Cost
$232,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.