AL 5 over TAYLOR CREEK

1.8 MI S BIBB CO LINE · County 105, Alabama · Built 1958 · 2 Lanes · 3,318 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
006171
Year Built
1958
Length
82.9 m (272 ft)
Max Span
10.4 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
3,318
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,102,000
Total Project Cost
$2,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.