CO 207 over RELIEF

0.6 MI N CO 240 · County 121, Alabama · Built 1957 · 2 Lanes · 870 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
006043
Year Built
1957
Length
93.3 m (306.1 ft)
Max Span
10.4 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
870
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,622,000
Total Project Cost
$1,784,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.