SR 106 MP 33.071 over PATSALIGA CREEK

.2 MI.W.CRENSHAW 77 · County 041, Alabama · Built 1957 · 2 Lanes · 630 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
006012
Year Built
1957
Length
59.7 m (195.9 ft)
Max Span
18.3 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
630
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,299,000
Total Project Cost
$1,429,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.