CO RD 80 over CR INTO LITTLE MUD CR

3 MI W CO 80 CO 90 JCT · County 059, Alabama · Built 1957 · 2 Lanes · 330 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
005993
Year Built
1957
Length
20.7 m (67.9 ft)
Max Span
5.2 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
330
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$486,000
Total Project Cost
$535,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.