US 80 E B L over SOAPSTONE CREEK
6.8 MI.E OF AL.41 · County 047, Alabama · Built 1957 · 2 Lanes · 3,695 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.323117, -86.906414
This bridge is in worse condition than 44.5% of bridges in County 047. The average bridge in Alabama is 0 years old; this one is 69 years old.
Nearby Bridges
US 80 over SOAPSTONE CREEK
Built 2010
CR #74 over SOAPSTONE CREEK
Built 1968
US 80 over TURNER CREEK
Built 1931
COUNTY HWY 1415 over DRUM CREEK
Built 1951
CR # 462 over TRIB TO CAMP CREEK
Built 1951
CR # 459 over CAMP CREEK
Built 1998
CR # 144 over SIX MILE CREEK
Built 1987
CR # 30 over TRIB TO SOAPSTONE CK
Built 1952
CR # 30 over TRIB TO SIX MILE CREEK
Built 1952
CR # 462 over CAMP CREEK
Built 1925
Bridge Details
- Structure #
- 005828
- Year Built
- 1957
- Length
- 51.8 m (169.9 ft)
- Max Span
- 9.8 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 3,695
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,276,000
- Total Project Cost
- $1,404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.