CO RT 106 over WEST SEPULGA RIVER

1.5 MI EAST MIDWAY · County 035, Alabama · Built 1956 · 2 Lanes · 325 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
005619
Year Built
1956
Length
15.7 m (51.5 ft)
Max Span
3.7 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
325
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$390,000
Total Project Cost
$429,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.