US 231 MP 56.131 over PEA RIVER RELIEF

0.2 MI. N.SR.123 · County 045, Alabama · Built 1956 · 2 Lanes · 7,235 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
005572
Year Built
1956
Length
124.4 m (408.1 ft)
Max Span
10.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
7,235
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,004,000
Total Project Cost
$3,304,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.