US 431 over LINE CREEK

.1 MI. SO.US 278 · County 055, Alabama · Built 1927 · 2 Lanes · 7,836 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
005387
Year Built
1927
Reconstructed
1956
Length
26.2 m (86 ft)
Max Span
8.7 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
7,836
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$750,000
Total Project Cost
$825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.