SR 123 MP 24.445 over KLONDIKE CREEK

3 MI. N. SR 134 · County 045, Alabama · Built 1926 · 2 Lanes · 4,210 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
005385
Year Built
1926
Reconstructed
1956
Length
16.2 m (53.1 ft)
Max Span
7.9 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
4,210
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$473,000
Total Project Cost
$520,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.