AL 66 over CHILATCHEE CREEK

4.5MI.W.AL#5 · County 047, Alabama · Built 1955 · 2 Lanes · 380 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
005267
Year Built
1955
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
380
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,106,000
Total Project Cost
$1,217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.