AL-5 over Blackwater Creek

AL-5 Blackwater Creek · County 127, Alabama · Built 1955 · 2 Lanes · 1,730 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
005110
Year Built
1955
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
1,730
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,277,000
Total Project Cost
$1,405,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.