CR 24 COOPER ENT over SOUTH PRONG
CR 24 1M W OF COOPER · County 021, Alabama · Built 1955 · 2 Lanes · 475 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.760714, -86.576139
This bridge is in worse condition than 59.5% of bridges in County 021. The average bridge in Alabama is 0 years old; this one is 71 years old.
Nearby Bridges
CR437 BOBGRIFFINRD over SOUTH PRONG CREEK
Built 1964
CR 24 over I-65
Built 1960
CR7 GRADY FRIDAYRD over SOUTH PRONG CREEK
Built 1987
I-65 over UT CHESTNUT CREEK
Built 1959
I-65 over UT CHESTNUT CREEK
Built 1959
CO RD 7 over BUCK CREEK
Built 1996
_GREER CREEK RD. over _TRIB. TO GREER CREEK
Built 2019
CR24 COOPER-ENTERP over CHESTNUT CREEK
Built 1955
US 31 over UT CHESTNUT CREEK
Built 1925
CR7 HUMPBACK ROAD over CR 7 BR OF CHESTNUT CRK
Built 1971
Bridge Details
- Structure #
- 005021
- Year Built
- 1955
- Length
- 21.3 m (69.9 ft)
- Max Span
- 4.3 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 475
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $623,000
- Total Project Cost
- $685,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.