SR 51 over UCHEE CREEK

11.5 MI N JCT SR 26 · County 113, Alabama · Built 1954 · 2 Lanes · 990 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
004892
Year Built
1954
Length
6.3 m (20.7 ft)
Max Span
3 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
990
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$230,000
Total Project Cost
$253,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.