US 84 MP 119.711 over PIGEON CREEK RELIEF

.2 MI.E.CONECUH CO.L. · County 039, Alabama · Built 1954 · 2 Lanes · 2,270 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
004820
Year Built
1954
Length
82.9 m (272 ft)
Max Span
10.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
2,270
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,911,000
Total Project Cost
$2,102,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.