AL - 4 (US 78) over CAHABA RIVER

AL - 4 CAHABA RIVER · County 073, Alabama · Built 1955 · 2 Lanes · 2,825 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
004770
Year Built
1955
Length
96 m (315 ft)
Max Span
21.3 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,825
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,387,000
Total Project Cost
$2,626,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.