US 31 SBL over PINE CREEK

0.2 MI N ELMORE CO LINE · County 001, Alabama · Built 1954 · 2 Lanes · 10,815 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
004760
Year Built
1954
Length
41.5 m (136.2 ft)
Max Span
10.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
10,815
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,123,000
Total Project Cost
$1,235,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.