AL 22 over BRANCH

0.1MI.E.AL.219 · County 047, Alabama · Built 1927 · 4 Lanes · 5,230 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
004714
Year Built
1927
Reconstructed
1954
Length
7 m (23 ft)
Max Span
3 m
Lanes
4
Daily Traffic
5,230
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$711,000
Total Project Cost
$782,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.