CO RD 23 over SIPSEY RIVER RELIEF

1.3 MI N LEWISTON · County 063, Alabama · Built 1953 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
004604
Year Built
1953
Length
40.5 m (132.9 ft)
Max Span
5.8 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
1,000
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$824,000
Total Project Cost
$906,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.