SR 87 MP 0.200 over PEA RIVER

0.2 MI N FL ST LINE · County 061, Alabama · Built 1951 · 2 Lanes · 1,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
004122
Year Built
1951
Length
288.6 m (946.9 ft)
Max Span
30.5 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
1,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,344,000
Total Project Cost
$5,878,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.