US 31 over GUM SWAMP BRANCH

2.7 MI S THORSBY · County 021, Alabama · Built 1924 · 2 Lanes · 6,590 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
003949
Year Built
1924
Reconstructed
1951
Length
31.5 m (103.3 ft)
Max Span
10.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
6,590
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,183,000
Total Project Cost
$1,301,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.