CR # 63 over TRIB TO MULBERRY CREEK

0.26 MI N OF CR 305 · County 047, Alabama · Built 1950 · 2 Lanes · 700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
003809
Year Built
1950
Length
10.7 m (35.1 ft)
Max Span
4.7 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
700
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$250,000
Total Project Cost
$275,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.