FAS 03 over BRANCH
1 MI S JCT SR 25 · County 019, Alabama · Built 1948 · 2 Lanes · 1,200 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
34.0801, -85.461044
This bridge is in worse condition than 34.7% of bridges in County 019. The average bridge in Alabama is 0 years old; this one is 78 years old.
Nearby Bridges
US 411 over BRANCH
Built 1928
CHEROKEE #101 over LUMPKIN CREEK
Built 1995
US 411 over SPRING CREEK
Built 1928
CHEROKEE #809 over BRANCH
Built 1935
US 411 over SPRING CREEK
Built 1928
US 411 over SPRING CREEK
Built 1928
CHEROKEE #29 over SPRING CREEK
Built 1950
CHEROKEE #157 over SPRING CREEK
Built 1961
CHEROKEE #101 over BRANCH
Built 1995
CHEROKEE #28 over BRANCH
Built 1995
Bridge Details
- Structure #
- 003237
- Year Built
- 1948
- Length
- 8.8 m (28.9 ft)
- Max Span
- 3 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,200
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $376,000
- Total Project Cost
- $414,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.