US 84 over BURNT CORN CREEK

0.5 MI E CO RD 11 · County 035, Alabama · Built 1947 · 2 Lanes · 2,578 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
003029
Year Built
1947
Length
103.6 m (339.9 ft)
Max Span
10.4 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
2,578
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,397,000
Total Project Cost
$2,637,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.