OLD WINCHESTER RD over FUQUA BRANCH

0.2 MI E CO RD 305 · County 089, Alabama · Built 1945 · 2 Lanes · 420 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
002881
Year Built
1945
Reconstructed
2008
Length
8.6 m (28.2 ft)
Max Span
8.6 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
420
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$262,000
Total Project Cost
$288,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.