SR 176 over BRANCH

13.0 MI N JCT SR68 · County 049, Alabama · Built 1942 · 2 Lanes · 704 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

34.343328, -85.689822

This bridge is in worse condition than 59.6% of bridges in County 049. The average bridge in Alabama is 0 years old; this one is 84 years old.

Nearby Bridges

Bridge Details

Structure #
002735
Year Built
1942
Length
6.4 m (21 ft)
Max Span
2.1 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
704
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$346,000
Total Project Cost
$381,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.