AL-96 over Gentry Creek

2.0 MI W of Millport · County 075, Alabama · Built 1942 · 2 Lanes · 1,481 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
002728
Year Built
1942
Length
22.4 m (73.5 ft)
Max Span
6.1 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
1,481
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$607,000
Total Project Cost
$668,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.