SR 5 over A.G.R

KIMBROUGH · County 131, Alabama · Built 1940 · 2 Lanes · 2,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

32.027725, -87.565128

This bridge is in worse condition than 75.8% of bridges in County 131. The average bridge in Alabama is 0 years old; this one is 86 years old.

Nearby Bridges

Bridge Details

Structure #
002267
Year Built
1940
Length
42.2 m (138.5 ft)
Max Span
16.6 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
2,700
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$926,000
Total Project Cost
$1,019,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.