US 29 MP 66.012 over THREE MILE CREEK

3 MI. S. SR. 106 · County 041, Alabama · Built 1938 · 2 Lanes · 1,440 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
002119
Year Built
1938
Reconstructed
1940
Length
40.8 m (133.9 ft)
Max Span
6.7 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
1,440
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$900,000
Total Project Cost
$990,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.