CR 571 over WIDOWS CREEK

0.35 MI W JCT CR 75 · County 071, Alabama · Built 1939 · 2 Lanes · 12 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
001894
Year Built
1939
Reconstructed
1996
Length
18.3 m (60 ft)
Max Span
11 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
12
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$384,000
Total Project Cost
$422,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.