AL-118 over Bogue Creek

Sulligent · County 075, Alabama · Built 1928 · 2 Lanes · 4,850 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
001818
Year Built
1928
Reconstructed
1938
Length
23.5 m (77.1 ft)
Max Span
5.8 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
4,850
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$591,000
Total Project Cost
$650,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.