SR 21 over A.G.R

FRISCO CITY · County 099, Alabama · Built 1938 · 2 Lanes · 5,070 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
001762
Year Built
1938
Length
74.1 m (243.1 ft)
Max Span
12.6 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
5,070
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,619,000
Total Project Cost
$1,781,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.