AL.10 over PERSIMMON CREEK

0.2 MI.E.OF AL.245 JCT. · County 013, Alabama · Built 1927 · 2 Lanes · 7,550 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
001695
Year Built
1927
Reconstructed
1938
Length
53.9 m (176.8 ft)
Max Span
12.2 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
7,550
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,056,000
Total Project Cost
$1,162,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.