READY SECTION RD over DRY CREEK
0.2 MI E FAS RT 02 · County 089, Alabama · Built 1937 · 2 Lanes · 400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
34.933269, -86.744158
This bridge is in worse condition than 60.4% of bridges in County 089. The average bridge in Alabama is 0 years old; this one is 89 years old.
Nearby Bridges
READY SECTION ROAD over DRY CREEK
Built 2005
WALL-TRIANA HWY over DRY CREEK
Built 1939
SHADY GROVE RD over SWEETWATER BRANCH
Built 1936
WALL TRIANA HWY over LIMESTONE CREEK
Built 2005
TURNER RD over DRY CREEK
Built 1952
ELKWOOD SECTION R over LIMESTONE CREEK
Built 1936
SR 53 over LIMESTONE CREEK
Built 1957
OLD R R BED RD over LIMESTONE CREEK
Built 1951
OLD R R BED RD over FORK OF LIMESTONE CREEK
Built 1966
READY SECTION RD over LIMESTONE CREEK
Built 1988
Bridge Details
- Structure #
- 001663
- Year Built
- 1937
- Length
- 8.5 m (27.9 ft)
- Max Span
- 4.3 m
- Width
- 6.6 m (21.7 ft)
- Lanes
- 2
- Daily Traffic
- 400
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $218,000
- Total Project Cost
- $240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.