CO 50 over BRANCH

0.3 MI E CO 89 · County 077, Alabama · Built 1937 · 2 Lanes · 235 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
001590
Year Built
1937
Length
9.8 m (32.2 ft)
Max Span
9.8 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
235
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$238,000
Total Project Cost
$262,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.