BROOKLANE DRIVE over VALLEY CREEK TRIB

100 N NOVEL DR HUEYTOWN · County 073, Alabama · Built 1936 · 2 Lanes · 11,160 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
001521
Year Built
1936
Length
13.9 m (45.6 ft)
Max Span
6.2 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
11,160
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$440,000
Total Project Cost
$484,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.