MURPHY HILL RD over BANYON SWAMP BRANCH

0.3 MI N CO RD 137 · County 089, Alabama · Built 1936 · 2 Lanes · 2,967 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
001499
Year Built
1936
Length
9.1 m (29.9 ft)
Max Span
9.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
2,967
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$282,000
Total Project Cost
$310,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.